| [ meld een fout in dit record ] | mandje (0): toevoegen | toon |
![]() |
| Experience using dynamic underkeel clearance systems: selected case studies and recent developments O'Brien, T. (2002). Experience using dynamic underkeel clearance systems: selected case studies and recent developments, in: Cox, R.J. (Ed.) 30th PIANC-AIPCN Congress, 22-26 September 2002, Sydney, Australia. pp. S10B P150(1) - S10B P150(12)
In: Cox, R.J. (Ed.) (2002). 30th PIANC-AIPCN Congress, 22-26 September 2002, Sydney, Australia. PIANC = AIPCN: Brussels, Belgium. Session I - Session X (55-1920) pp., meer
|
| Beschikbaar in | Auteur |
| |
| Documenttype: Congresbijdrage | |
| Trefwoord |
|
| Auteur | Top | |
|
| Abstract |
Since the DUKC system was first developed in 1993, ten customised versions have been commissioned by ports around Australia and New Zealand. Research and development of the DUKC system has continued during that time and has been greatly assisted by continuing interaction between harbour masters, pilots, port users and the design team. Recent major DUKC developments include: the application of meteorological and wave forecasting models to provide predictions of maximum drafts and tidal windows up to 36 hours prior to sailing; the near real-time modelling of the dynamic motions in waves of each particular ship in its actual loaded condition; continuous processing of real-time tide and wave data by the DUKC system, allowing predicted changes in maximum draft or tidal windows to be updated automatically during the final hours prior to sailing. Two case studies involving the application of DUKC systems and the associated benefits obtained are described. |
| Top | Auteur |
