Zoeken
Zoeken kan via de modus 'eenvoudig zoeken' (één veld) of uitgebreid via 'geavanceerd zoeken' (meerdere velden). Zo kan je bv. zoeken op een combinatie van een auteursnaam (auteur), een jaartal (jaar) en een documenttype.
Boekenmand
Nuttige resultaten kan je aanvinken en toevoegen aan een mandje. De inhoud hiervan kan je exporteren of afdrukken (naar bv. PDF).
RSS
Op de hoogte blijven van nieuw toegevoegde publicaties binnen uw interessegebied? Dit kan door een RSS-feed (?) te maken van jouw zoekopdracht.
nieuwe zoekopdracht
Implementing a trans-boundary flood risk management plan: a method for determining willingness to cooperate and case study for the Scheldt estuary
Zagonari, F. (2013). Implementing a trans-boundary flood risk management plan: a method for determining willingness to cooperate and case study for the Scheldt estuary. Nat. Hazards 66(2): 1101-1133. https://dx.doi.org/10.1007/s11069-012-0538-1
In: Natural Hazards. Springer: Dordrecht; London; Boston. ISSN 0921-030X; e-ISSN 1573-0840, meer
| |
| Author keywords |
Contingent valuation; Risk perception; EU Floods Directive; Scheldt estuary |
| Abstract |
In this paper, I applied statistical, econometric, and mathematical methodologies to evaluate the conditions required for implementing a publicly supported trans-boundary flood risk management plan in accordance with the EU Floods Directive (2007/60/EU). Although this paper adopts a focus on the methodology rather than on solving a specific problem, the Scheldt estuary is used to provide an illustrative case study of this approach. I showed that, apart from some expected minor differences, the Belgians and the Dutch can be considered a relatively homogeneous population. Moreover, I estimated the main determinants of both perceived flood risk (PFR) and willingness to pay (WTP) for a compensation fund by using a linear model and an ordered probit model (based on a double-bounded dichotomous-choice approach), respectively. Some policies appear to be potentially effective: a campaign to inform the general public about evacuation and trauma management could increase WTP by 19 and 21 %, respectively; an information campaign focused on young women could reduce PFR; and a campaign to inform the general public about flood strategies and the need to disregard flood events in the press could reduce PFR by 56 and 54 %, respectively. Finally, I showed that, apart from some expected differences between the values at risk in Belgium and the Netherlands, both individual rationality and overall feasibility conditions are met. Thus, if information campaigns and other measures are designed to account for differences between the Belgians and the Dutch, a publicly supported trans-boundary flood risk management plan can be successfully implemented. |
IMIS is ontwikkeld en wordt gehost door het VLIZ.