In 2012 verloren we Jean Jacques Peters, voormalig ingenieur van het Waterbouwkundig Laboratorium (1964 tot 1979) en internationaal expert in sedimenttransport, rivierhydraulica en -morfologie. Als eerbetoon aan hem hebben we potamology (http://www.potamology.com/) gecreëerd, een virtueel gedenkarchief dat als doel heeft om zijn manier van denken en morfologische aanpak van rivierproblemen in de wereld in stand te houden en te verspreiden.
Het merendeel van z’n werk hebben we toegankelijk gemaakt via onderstaande zoekinterface.
Limitations in morphological modeling within the framework of the European bird and habitat directives
Peters, J.J.; Plancke, Y. (2010). Limitations in morphological modeling within the framework of the European bird and habitat directives, in: SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010. pp. [1-8]
In: (2010). SIMHYDRO 2010: modèles hydrauliques et incertitudes, Nice, 2-4 juin 2010: proceedings. Société Hydrotechnique de France: [s.l.]. ISBN 2-906831-83-2.
Estuaries are very dynamic systems in terms of hydraulic, morphological and ecological functioning. They have been undergoing significant changes due to natural processes and under influence of human activities. In the past, little attention was paid to the possible ecological impact provoked by engineering, bank protection works and dredging activities. Today, many European ports located on estuaries demand a better maritime access by dredging. Because of the European Bird and Habitat Directives, projects must undergo EIA or SEA studies, which traditionally are executed with numerical modeling tools. Most stakeholders do not know enough about the limitations of numerical modeling of the morphological and ecological effects. Information of the stakeholders about these limitations is necessary. However, uncertainties exist about these effects and because of the precautionary principle, projects might be rejected while these would be needed for curbing negative evolutions in the estuary. A cautious approach is therefore needed, assessing new projects with not only numerical models, rather with in addition scale modeling, desk studies, field surveys and studies and, last but not least expertise. In this paper the case of the Western Scheldt estuary is discussed, in which the involvement of the stakeholders was crucial in the acceptance process.
Alle informatie in het Integrated Marine Information System (IMIS) valt onder het VLIZ Privacy beleid