| By an order dated 12 November 2002, Mr President of the Court appointed a panel of 5 experts (including Mr. Peters) with the mission: - to regroup all the studies on the Var for the purpose of
- determining whether the published flood reference can be validated
- if they sufficiently take into account the consequences of the proposed work to the risk of flooding
- if they determine precisely the level of lowering or elimination of thresholds involved in the RN 202bis - project to enable a satisfactory stormwater runoff , solid materials and hilly waters in relation to flood risk , erosion and rupture thresholds and dikes
- if they offer any good technical solution for modifying the base and the level of RN 202bis , as well as work and preventing and protecting works to realize not increase the risk of flooding
- where necessary to complement or supplement to these studies on all the points above-named
|