Het OWA, het open archief van het Waterbouwkundig Laboratorium heeft tot doel alle vrij toegankelijke onderzoeksresultaten van dit instituut in digitale vorm aan te bieden. Op die manier wil het de zichtbaarheid, verspreiding en gebruik van deze onderzoeksresultaten, alsook de wetenschappelijke communicatie maximaal bevorderen.
Dit archief wordt uitgebouwd en beheerd volgens de principes van de Open Access Movement, en het daaruit ontstane Open Archives Initiative.
Basisinformatie over ‘Open Access to scholarly information'.
A methodology for multi-criteria design of multi-use offshore platforms for marine renewable energy harvesting
Zanuttigh, B.; Angelelli, E.; Kortenhaus, A.; Koca, K.; Krontira, Y.; Koundouri, P. (2016). A methodology for multi-criteria design of multi-use offshore platforms for marine renewable energy harvesting. Renew. Energy 85: 1271-1289. https://dx.doi.org/10.1016/j.renene.2015.07.080
In: Renewable Energy. Elsevier: Oxford. ISSN 0960-1481; e-ISSN 1879-0682, meer
| |
Trefwoord |
|
Author keywords |
Offshore platforms; Multi-use; Wave energy; Aquaculture; Wind energy;Multi-criteria methodology |
Auteurs | | Top |
- Zanuttigh, B.
- Angelelli, E.
- Kortenhaus, A., meer
|
- Koca, K.
- Krontira, Y.
- Koundouri, P.
|
|
Abstract |
Multi-use offshore platforms (MUPs) combining renewable energy from the sea, aquaculture and transportation facilities can be considered as a challenging way to boost blue growth and make renewable energy (especially wave energy) environmentally and socio-economically sustainable. MUPs allow sharing the financial and other market/non-market costs of installation and management, locally using the produced energy for different functionalities and optimizing marine spatial planning. The design of these solutions is a complex interdisciplinary challenge, involving scientists and technical experts with different backgrounds. This paper presents a new methodology for the design of a MUP based on technical, environmental, social and economic criteria. The methodology consists of four steps: a pre-screening phase, to assess the feasibility of different maritime uses at the site; a preliminary design of the alternative schemes based on the identified maritime uses; a ranking phase, where the performance of the MUPs is scored by means of expert judgment of the selected criteria; a preliminary design of the selected MUP selected. An example application of this procedure to a site offshore the Western Sardinia coast, Mediterranean Sea, Italy, is provided. In this site the deployment of a MUP consisting of wave energy converters, offshore wind turbines and aquaculture is specifically investigated. |