Het OWA, het open archief van het Waterbouwkundig Laboratorium heeft tot doel alle vrij toegankelijke onderzoeksresultaten van dit instituut in digitale vorm aan te bieden. Op die manier wil het de zichtbaarheid, verspreiding en gebruik van deze onderzoeksresultaten, alsook de wetenschappelijke communicatie maximaal bevorderen.
Dit archief wordt uitgebouwd en beheerd volgens de principes van de Open Access Movement, en het daaruit ontstane Open Archives Initiative.
Basisinformatie over ‘Open Access to scholarly information'.
Assessing the impact of offshore wind siting strategies on the design of the European power system
Radu, D.; Berger, M.; Dubois, A.; Fonteneau, R.; Pandžić, H.; Dvorkin, Y.; Louveaux, Q.; Ernst, D. (2022). Assessing the impact of offshore wind siting strategies on the design of the European power system. Appl. Energy 305: 117700. https://dx.doi.org/10.1016/j.apenergy.2021.117700
In: Applied Energy. Applied Science Publishers: London. ISSN 0306-2619; e-ISSN 1872-9118, meer
| |
Trefwoord |
|
Author keywords |
Asset siting; Two-stage method; Offshore wind; Resource complementarity; Capacity expansion planning |
Auteurs | | Top |
- Radu, D., meer
- Berger, M.
- Dubois, A.
- Fonteneau, R.
|
- Pandžic, H.
- Dvorkin, Y.
- Louveaux, Q.
- Ernst, D.
|
|
Abstract |
This paper provides a detailed account of the impact of different offshore wind siting strategies on the design of the European power system. To this end, a two-stage method is proposed. In the first stage, a highly-granular siting problem identifies a suitable set of sites where offshore wind plants could be deployed according to a pre-specified criterion. Two siting schemes are analysed and compared within a realistic case study. These schemes essentially select a pre-specified number of sites so as to maximize their aggregate power output and their spatiotemporal complementarity, respectively. In addition, two variants of these siting schemes are provided, wherein the number of sites to be selected is specified on a country-by-country basis rather than Europe-wide. In the second stage, the subset of previously-identified sites is passed to a capacity expansion planning framework that sizes the power generation, transmission and storage assets that should be deployed and operated in order to satisfy pre-specified electricity demand levels at minimum cost. Results show that the complementarity-based siting criterion leads to system designs which are up to 5% cheaper than the ones relying on the power output-based scheme when offshore wind plants are deployed with no consideration for country-based deployment targets. On the contrary, the power output-based scheme leads to system designs which are consistently 2% cheaper than the ones leveraging the complementarity-based siting strategy when such constraints are enforced. The robustness of the reported results is supported by a sensitivity analysis on offshore wind capital expenditure and inter-annual weather variability, respectively. |