Over het archief
Het OWA, het open archief van het Waterbouwkundig Laboratorium heeft tot doel alle vrij toegankelijke onderzoeksresultaten van dit instituut in digitale vorm aan te bieden. Op die manier wil het de zichtbaarheid, verspreiding en gebruik van deze onderzoeksresultaten, alsook de wetenschappelijke communicatie maximaal bevorderen.
Dit archief wordt uitgebouwd en beheerd volgens de principes van de Open Access Movement, en het daaruit ontstane Open Archives Initiative.
Basisinformatie over ‘Open Access to scholarly information'.
one publication added to basket [213190] |
A non-parametric data-based approach for probabilistic flood forecasting in support of uncertainty communication
Van Steenbergen, N.; Ronsyn, J.; Willems, P. (2012). A non-parametric data-based approach for probabilistic flood forecasting in support of uncertainty communication. Environ. Model. Softw. 33: 92-105. https://dx.doi.org/10.1016/j.envsoft.2012.01.013
In: Environmental Modelling & Software. Elsevier: Oxford. ISSN 1364-8152; e-ISSN 1873-6726, meer
| |
Author keywords |
Uncertainty estimation; Probabilistic forecasting; Operational flood forecasting; Non parametric approach |
Auteurs | | Top |
- Van Steenbergen, N.
- Ronsyn, J., meer
- Willems, P., meer
|
|
|
Abstract |
In addition to structural measures, governmental authorities have set up flood forecasting systems to be used as early warning systems, to minimize the damage of future floods. These flood forecasting systems make use of hydrological and hydrodynamic models and input time series (measured and predicted rainfall, evapotranspiration, water levels and discharges). The uncertainty of these models and time series, certainly the predicted rainfall, is high and not always known. Consequently the prediction power of the flood forecasting systems is often unclear. To calculate the predictive uncertainty in the forecasts, a method has been set up, which involves computation of the exceedance probability of alert and alarm levels. The uncertainty results allow far more complete information to be provided to decision makers (in comparison with deterministic model-based forecasts).The uncertainty estimation is based on the statistical analysis of historical flood forecasting results. The forecast residuals (differences between predictions and measurements at river gauging stations) have been analysed using a non parametric technique. Because the residuals are correlated with the value of the simulated water level and time horizon, the residuals are split up into discrete classes of simulated water levels and time horizons. For each class, percentile values of the residuals are calculated and stored in a so called ‘three dimensional error matrix’. Based on 3D interpolation in the error matrix, con"dence intervals on forecasted water levels are calculated and visualised. The method is implemented in software for post processing of the forecast results, and is connected to the database of a river flood forecasting system in Belgium. Hereby it is possible to update the error matrix in real time, based on new simulations. |
IMIS is ontwikkeld en wordt gehost door het VLIZ.