Het OWA, het open archief van het Waterbouwkundig Laboratorium heeft tot doel alle vrij toegankelijke onderzoeksresultaten van dit instituut in digitale vorm aan te bieden. Op die manier wil het de zichtbaarheid, verspreiding en gebruik van deze onderzoeksresultaten, alsook de wetenschappelijke communicatie maximaal bevorderen.
Dit archief wordt uitgebouwd en beheerd volgens de principes van de Open Access Movement, en het daaruit ontstane Open Archives Initiative.
Basisinformatie over ‘Open Access to scholarly information'.
one publication added to basket [296020] |
Impact of real case transmission systems constraints on wind power operation
Vallée, F.; Lobry, J.; Deblecker, O. (2011). Impact of real case transmission systems constraints on wind power operation. Eur. Trans. Electr. Power 21(8): 2142-2159. https://dx.doi.org/10.1002/etep.549
In: European Transactions on Electrical Power. Wiley: Berlin. ISSN 1430-144X; e-ISSN 1546-3109, meer
| |
Author keywords |
transmission system; wind power; uncertainty; network reinforcement;investments; HLII reliability |
Auteurs | | Top |
- Vallée, F., meer
- Lobry, J., meer
- Deblecker, O.
|
|
|
Abstract |
In this paper, a general strategy is proposed in order to introduce in a realistic way wind power into a HLII (bulk power system) nonsequential Monte Carlo adequacy study with economic dispatch. By use of the implemented solution, wind power can consequently be confronted to operational constraints related to high-powered thermal units, nuclear parks or cogeneration. Moreover, in order to optimize the large-scale integration of wind power production, the required reinforcements on a given electrical grid can also be evaluated on basis of the presented developments. The elaborated strategy can practically be applied to every kind of nonsequential Monte Carlo approach used to technically analyze a given transmission system. In the context of this work, the proposed solution has been implemented into the simulation tool Scanner(C) (property of Tractebel Engineering - Gaz de France - Suez company). Finally, in order to point out the efficiency and the usefulness of the proposed wind power model, the developed simulation tool has been firstly applied to an academic test system: the Roy Billinton test system (RBTS). Afterwards, in order to fully access the large offshore wind potential in the North Sea, the same tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network. |