Het OWA, het open archief van het Waterbouwkundig Laboratorium heeft tot doel alle vrij toegankelijke onderzoeksresultaten van dit instituut in digitale vorm aan te bieden. Op die manier wil het de zichtbaarheid, verspreiding en gebruik van deze onderzoeksresultaten, alsook de wetenschappelijke communicatie maximaal bevorderen.
Dit archief wordt uitgebouwd en beheerd volgens de principes van de Open Access Movement, en het daaruit ontstane Open Archives Initiative.
Basisinformatie over ‘Open Access to scholarly information'.
one publication added to basket [322863] |
How and where to pass? Atlantic salmon smolt's behaviour at a hydropower station offering multiple migration routes
Renardy, S.; Benitez, J.-P.; Tauzin, A.; Dierckx, A.; Matondo, B.N.; Ovidio, M. (2020). How and where to pass? Atlantic salmon smolt's behaviour at a hydropower station offering multiple migration routes. Hydrobiologia 847(2): 469-485. https://dx.doi.org/10.1007/s10750-019-04108-w
In: Hydrobiologia. Springer: The Hague. ISSN 0018-8158; e-ISSN 1573-5117, meer
| |
Trefwoord |
Salmo salar Linnaeus, 1758 [WoRMS]
|
Author keywords |
Salmo salar; Downstream migration; Fish trajectory; Fish telemetry; Fishpassage; Archimedes screw |
Abstract |
We studied downstream migration behaviour of Atlantic salmon smolt at a hydropower station that offers four safe (weir, new incision gate on weir, downstream bypass and Archimedes screw) and one potentially unsafe (Kaplan turbines) migration routes. We followed hatchery smolts using radio (n = 17) and RFID (n = 200) telemetry. They were released 1.2 km upstream of the hydropower station in spring 2018, in four groups, at different water discharge (18 to 37.2 m3s−1) and temperature (12.2–17.6°C) conditions. For radio-tagged smolts, the repartition of the migration routes was 41.2% for the bypass, 17.6% for both the Kaplan turbine and the weir, 11.8% for the Archimedes screw, 0% for the new incision and 11.8% of unknown route. For the RFID-tagged smolts, the repartition was 38.0% for the bypass, 56.5% for the weir or the Kaplan, 4.5% for the new incision and 1.0% for the Archimedes Screw. The median time to cross the hydropower station was 58 min, and 88.2% of the smolts succeed to continue their downstream migration. The results demonstrate a diversity of choices of migration routes and underline the importance to optimise the position of fish-friendly turbines and fish passes at hydropower stations to increase their attractiveness. |